Building Safety Regulator publishes Enforcement Policy Statement
The Building Safety Regulator's enforcement policy statement details how it will enforce the building safety regime.
The policy statement sets out the BSR's approach to enforcement and action to enforce the law when non-compliance, hazard or serious risk during the building or alteration and management of higher-risk buildings have been identified.
When acting as a Building Control authority for higher-risk buildings, the BSR can serve the following enforcement notices:
- a compliance notice when a duty holder contravenes or is likely to contravene a provision of building regulations
- a stop notice can be served when building work contravenes a provision of building regulations and the use of the building would present a risk of serious harm to people in or around the buildings, or where work is taking place without building control approval, or a compliance notice has been contravened
- a notice requiring alteration or removal of offending work where building work contravenes a provision of building regulations
When regulating occupied higher-risk buildings, the BSR can:
- serve a compliance notice on an accountable person when it appears to the regulator that there is a contravention that requires action to be taken within a certain time period - if the contravention places people in imminent danger, the regulator can specify that the contravention notice is an urgent action notice
Failure to comply with any of these enforcement notices is a criminal offence and can result in prosecution. The BSR can also apply to a tribunal to appoint a special measures manager for an occupied higher-risk building. This action will be considered where the accountable person is repeatedly failing to manage building safety risk, is taking no action to comply with duties, and residents are put at risk of serious harm. This action can be taken in addition to prosecution.
Under the Building Safety Act 2022, the BSR is also responsible for regulating the building control profession. The BSR can:
- make disciplinary orders
- vary, suspend or cancel registration for RBCAs and RBIs; and/or
- impose financial penalties on RBCAs and RBIs
- prosecute criminal offences relating to registration and the OSRs
- issue an improvement notice to a LA or RBCA if it appears they have contravened the OSR
- issue a serious contravention notice to a LA or RBCA if it appears that either the OSRs have been contravened and, as a result, the safety of persons in or about building has been, or may have been, put at risk; or they have been given an improvement notice and failed to remedy the contravention(s) contained within that notice
- recommend to the Secretary of State a transfer of a LA’s building control functions to another LA or the Secretary of State
The Enforcement Policy Statement can be found in full here
This article appears on the CIAT news and blog site as "BSR publishes Enforcement Policy Statement" dated December 8, 2023.
--CIAT
[edit] Related articles on Designing Buildings
- AT Building Safety Hub.
- Building Safety Alliance.
- Building safety certificate.
- Building Safety Regulator.
- Chief inspector of buildings.
- CIC response to Hackitt report.
- Consultation on banning the use of combustible materials in the external walls of high-rise residential buildings.
- Grenfell Tower articles.
- Grenfell Tower Fire.
- Grenfell Tower independent expert advisory panel
- Grenfell Tower industry response group.
- Grenfell Tower Inquiry.
- Grenfell Tower working group.
- Hackitt review of the building regulations and fire safety, final report.
- ICE Grenfell Tower review.
- Independent review of the building regulations and fire safety.
- Joint Competent Authority.
- Reform of building safety standards.
- Sweeping building safety measures announced.
- The Building Safety Bill and product testing.
- The Construction Industry Council summarises what to expect from the Construction Products Regulations.
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.